Conroysgroup have successfully redesigned a 200m open cut design to install a new 280mm HPPE raw water main in partnership with @onealliance. We completed the section which would have required a Road closure for three weeks with two Horizontal Directional Drill shots minimising the waste movements and local disruption.
No comments:
Post a Comment